+50
Brand
Partners
+3
Inspection
Rounds
+14
Day Sample
Turnaround

Our Process — Precision Garment Manufacturing | UP Fashion

DSPQ Process / Four-stage
Atelier Precision
Work With Us →

Small-batch manufacturing partner for 1–50 person fashion companies.

Design
Sample
Build
Stage 01
D

Design & Tech Pack

Rough sketch to production-ready tech pack. Digital pattern making with size grading across every size in your collection. Every seam, dart, pleat, and finish specified before cutting begins.

Digital PatternSize Grading7–10 Days
Stage 02
S

Sample Development

2–3 mock-up rounds using similar fabrics. Construction test, fit refinement, production efficiency optimization. Final sample in correct fabric — client approval before production begins.

2–3 Mock-upsProgress Photos14–21 Days
Stage 03
P

Production

Dedicated cell of 5 skilled workers per collection. Your pieces never mixed with other brands. Every garment tracked from cut to ship. 3 in-line QC inspections during production.

50+ Pcs/StyleDedicated Cell28–35 Days
Stage 04
Q

Quality Control

3 inspections per garment. Size-by-size measurement verification. Live model try-on and mannequin form fit check. AQL 1.0–2.0 enforced on every order — 50 pieces or 1,000. Video documentation before shipment.

3 InspectionsLive Model FitAQL 1.0–2.0
Begin Your Project

Start Your First
Sample Today.

Send us your sketch or tech pack. Timeline and quote within 24 hours. MOQ 50 pieces.

Start a Sample Project

Talk to our team.

Choose the person who best fits your project. Both reply within 4 hours.

Deng
Deng
Project Manager & Sales
Available now
Kiki
Kiki
Designer & Merchandiser
Available now
// Contact Modal (unified, works on all pages) function openContactModal(){ var overlay=document.getElementById('contactModalOverlay'); if(overlay){overlay.classList.add('open');document.body.style.overflow='hidden';} } function closeContactModal(){ var overlay=document.getElementById('contactModalOverlay'); if(overlay){overlay.classList.remove('open');document.body.style.overflow='';} }

Frequently asked about the UP Fashion Process

How does the DSPQ process work?

DSPQ stands for Design, Sample, Production, Quality. Stage 1: Design & Tech Pack creation. Stage 2: 2-3 mock-up rounds with progress photos, final sample in correct fabric. Stage 3: Dedicated production cell, as few as 50 pieces per style. Stage 4: 3 QC inspections per garment, live model fit check, AQL 1.0-2.0.

How long does each stage take?

Design & Tech Pack: 5-7 days. Sample Development: 14-21 days for mock-ups, 28-42 days for final sample. Production: 6-10 weeks depending on volume. Quality Control runs concurrently with production and adds 3-5 days for final inspection and documentation.

What happens if the sample doesn't pass QC?

We refine through additional mock-up rounds at cost until the garment meets the standard. Our 98% first-sample approval rate means most clients are satisfied on the first final sample. All defects are documented, reworked, and re-inspected before shipping.