A signed production document and an approved sample on a desk at a Guangzhou garment workshop

Most private label clothing manufacturer disputes we have seen were not about quality. They were about a document nobody wrote. When the spec is silent, the argument is settled by whoever is more stubborn in week nine.

A two-page production agreement, signed before the deposit, answers those questions in advance. Here are the nine clauses we will not start without, and the specific failure each one prevents.

The nine clauses a production agreement must contain

Parties first. The legal name must match the bank account exactly, with the registration number beside it. A payment sent to a name that does not match the invoice is how brands lose money to a lookalike account.

Scope second: style numbers, size ratio, and quantity with a tolerance. Price and incoterm third: FOB or DDP, currency, and what the price excludes, such as duty or testing.

Payment fourth: 30 per cent against a proforma invoice, 70 per cent against documents. Delivery fifth, and it needs a definition rather than a date on its own.

Quality sixth: the approved sample as reference, an AQL level, and a tolerance table attached as an annex. IP seventh: patterns, artwork and labels, and who holds each one after the run ends.

Claims eighth: a window, the evidence required, and the remedies. Cancellation and law ninth: what happens to the deposit at each stage, and which law governs if it goes wrong.

What quantity tolerance means on a 30-piece order

Fabric arrives short, rolls end early, and defects get cut around. A 3 per cent tolerance on 30 pieces is 0.9 of a garment, so the practical wording is 30 pieces, plus or minus one.

The invoice follows shipped quantity, not ordered quantity. If you need exactly 30 for a stockist, put that in the agreement and accept the cost of cutting a spare.

Over-shipment is not a gift. Either it is billed at the agreed price or it is a free sample, and the agreement should say which before the carton is packed.

Delivery date: ex-factory, on board, or delivered

Three different dates hide inside the word delivery. Ex-factory is when the goods leave our floor, on board is when the aircraft or vessel loads them, and delivered is when they clear customs at your address.

Put the leg in writing: five to seven days by air, 28 to 35 by sea, plus two to five days of customs at either end. A date without a leg is a wish with a deadline attached.

Force majeure should name what counts: a typhoon closure at the port, a scheduled power cut, Chinese New Year, a mill failure. Name the effect too, which is an extension of the date rather than a cancellation.

Add a notice clause while you are there: two working days to report a delay, in writing, with the reason. Most late orders are known to be late in week two and reported in week eight.

Cancellation, deposit and the clause everyone skips

Write the forfeiture schedule before you need it. Before fabric is ordered, the deposit is refunded minus pattern work, usually $180 to $260. After the cloth is bought and cut, the deposit is gone, because the cloth is already yours.

On a $2,400 order the 30 per cent deposit is $720, which is roughly what the fabric costs. That is not a coincidence, and it is why a factory cannot refund it once the spreader has run.

A verbal we will sort it out is what turns into a three-week argument with a lawyer's letter at the end of it.

Ask one question about the deposit: what exactly is it buying? If the answer is a percentage, ask again. On a 30-piece run the deposit buys fabric and trim, and a factory that cannot name the metres has not costed your order.

Why two pages beat a twelve-page template

A lawyer's template costs $300 to $600 and cites Incoterms revisions and arbitration rules a 30-piece order will never reach. What actually decides the outcome is names, numbers, dates, tolerances and ownership.

Nine clauses fit on two pages. Ours is written in plain English with the technical annexes attached, because a document nobody reads protects nobody.

Language matters more than length. If the agreement is in English and the workshop reads Chinese, attach a one-page Chinese summary of the nine items. Ours has one, and it is the page the cutting room actually uses.

In 2020 we shipped a 40-piece order with no written hem tolerance. The brand measured the hem 1.5 centimetres shorter than our sample, neither side could prove where the measurement started, and we settled with a $310 credit.

Two pages and a measurement chart would have cost nothing. Every agreement we sign now carries the annex, and so does every quotation we send.

What to attach to the agreement

Attach four documents: the spec sheet with tolerances, photographs of the approved sample with a tape measure on it, the trim card, and the fabric card with mill reference and lot numbers.

Those four annexes are what a claim is argued from later. Without them the agreement is a promise; with them it is a record.

Fashion Pains Solver, our claim-tracking tool, is still in training, so claims currently run through a spreadsheet and one named person. That is slower than it will be, and faster than an email thread nobody owns.

Our private label program sends a draft agreement with the first quotation, the case studies show how a tolerance annex settled a real dispute, and the FAQ answers the deposit questions this document exists to prevent.