
A small batch clothing manufacturer will normally ask for 30% with the order and the remaining 70% before the goods leave. That split is standard and not worth arguing about. What matters far more is what the 70% is tied to, because that is the part that protects you.
So when is the balance actually due? Not on a date. On a set of documents that prove the order is finished and inspected. If your terms say balance before shipment, ask for the list of documents that triggers it, in writing.
Here is what we send, when we ask, and the order where we asked too early.
The balance is a document trigger, not a date
Four documents do the work: the pre-shipment inspection report, the packing list, the commercial invoice, and the transport document, which is a bill of lading copy for sea or an air waybill for air.
Why does this matter? If the balance is tied to a date, the date arrives whether the goods are ready or not, and you pay on a promise. If it is tied to documents, you pay on evidence. The same 70% behaves very differently under those two sets of terms.
We write those four documents into the proforma invoice, together with the incoterm, so there is no version of the story where the balance is due before the report exists.
What we send before we ask for the balance
The pre-shipment report comes first, with the defect counts and the AQL level used. Then the measurement sheet per size against the agreed tolerances, the carton photos, and the packing list with weights and dimensions.
The commercial invoice follows, matching the proforma exactly: same description, same HS code, same incoterm, same currency. Small mismatches here cause customs delays far more often than the duty rate does.
For clients who cannot visit, we add a short video of the cartons being sealed. It takes two minutes and removes most of the anxiety around paying a factory eight time zones away.
When the inspection fails: holdback, rework, re-inspect
Minor defects inside the agreed AQL: we ship, and the count sits on the report so you know what to expect. Major defects above the threshold: we rework or remake before we ask for anything.
Four garments needing a remake takes five to seven days. We absorb that rather than pushing the balance request and letting the problem travel to you.
Some brands ask to hold 10% for thirty days after arrival on a first order. We have agreed to that twice. We do not agree to it on a reorder, where the sample is approved and the risk is known.
What we never accept is the reverse: a balance paid before any inspection exists. On a first order, that is the line to hold.
Red flags around the final payment
The balance is demanded before an inspection report exists. The account name on the invoice does not match the company name. Payment is pushed toward cash or a personal account, which no legitimate factory needs.
The one to watch hardest is a last-minute change of bank details by email. That message pattern is fraud almost every time it appears, and it does not come from the factory. Call the person you have been dealing with, on a number you already have, before any wire moves.
And if there is no packing list, no carton numbers and no measurement sheet, the order is not finished, whatever the calendar says.
The 2020 order where we asked too early
In 2020 we sent a balance request with a photo of finished garments on the table, before the pre-shipment inspection had run. The client paid within a day. Four cartons then turned up with the wrong care labels.
We reprinted thirty labels and air-freighted them at our own cost. It was a small sum and a fair hit, because we had asked for money against a photo.
Since then the balance request goes out with the inspection report attached and nothing else. Clients pay faster, not slower, when the evidence arrives with the ask.
Reorders: when the balance can move earlier
On a second run of the same style, with an approved sample on file and the same fabric lot, we will sometimes accept 50% on order and 50% after arrival. That is not a discount; it is a lower risk profile.
Ask for it after a clean first run, not before. A second order is cheaper to set up anyway, which is exactly why the risk on it is smaller.
Payment terms sit next to everything else in an order. Our small batch production page covers what we run and at what size, the case studies page shows completed orders, the FAQ page answers payment and shipping questions, and the production process page maps the stages that produce those four documents.
Go deeper: why factories ask for a deposit at all · payment methods, fees and red flags · what happens after sample approval
Questions we get about this
Can I pay the balance after the goods arrive?
On a first order, no. On a reorder with an approved sample, sometimes. It is a risk question rather than a trust question.
What if I find a defect after I have paid the balance?
The pre-shipment report is the baseline. Anything matching it was declared; anything outside it comes back to us under our claim process.
Quick Take
Tie the 70% to documents, not a date. Report, packing list, invoice, transport document.
Never wire before an inspection exists. A photo of goods on a table is not an inspection.
Treat a change of bank details as fraud. Call the number you already have before the wire moves.
About UP Fashion
UP Fashion is a Guangzhou garment manufacturer founded in 2016, run by a team with 20+ years of OEM experience in silk, viscose and embroidery. We quote from 30 pieces, show the rate we used, and inspect three times before shipping.



