Nobody sends you a quote with the real cost per garment on it. We write quotes for a living and even ours has lines that surprise people on the first read.
What's missing from most of them? Four things: fabric waste, the second and third sample, freight, and the cost of fixing a mistake after you've signed off. 200 metres of cloth does not make 200 garments, on one recent style it made 180. Add those four to the cheap quote and the ranking usually flips.
Below is how we read a quote sheet, and why two factories can come back three times apart on what looks like the same dress.
The six lines, and what each one hides
On most of our styles fabric is the biggest single line and cut-make-trim is the second. The rest tend to get rounded away, and that's exactly where the trouble lives.
Fabric
The largest line and the least comparable one. Silk has three numbers you have to ask for before anybody can quote it: momme weight, grade, and weave. Silk blend is not a specification. Our wool comes from Biella (Super 120s), silk from Suzhou, cupro from Osaka, name those and a mill can match them, say wool fabric and you'll get whatever was cheap that week.
Fabric pricing also moves with quantity in a way brands don't expect. A mill sells you 60 metres for a 30-piece run at one rate and 1,000 metres at quite another.
Cut, make, trim
The labour. Per piece it barely changes between 30 and 500 units. What changes is how much fixed setup is sitting inside it, pattern, grading, the mock-ups, and the line being made ready.
Trims
Zips, buttons, interlining, labels, hangtags, shoulder pads. Cheap quotes quietly substitute these after approval, which is why we list them by name and check them again at packing.
Sampling
Charged separately, then deducted from the bulk order once you place it. Ask whether the factory does the same, because some keep it.
Quality control
Often not a line at all, and that's the tell. Ours is three inspections per piece, AQL 1.0 to 2.0, measurement at every size, a fit on a live model and a mannequin, and a video record of the batch before it leaves.
Freight
In our quote, named. Sea is cheap and slow, air is fast and brutal. Air freight to cover a late fabric booking can easily cost more than the sampling did, which is why the fabric calendar matters more than the sewing calendar.
The lines brands forget to budget
- Waste and width. 200 metres made 180 pieces. Ten percent gone before cutting even finished.
- Sample rounds two and three. Two to three mock-ups is normal, not failure. Budget 14 to 21 days for them, then 28 to 42 for the final sample in the correct fabric.
- Fabric lead time. Add 2 to 4 weeks if the factory is sourcing. Most late deliveries are fabric delays, not sewing delays.
- Rework. Sign off too early and you pay for the batch twice. It's the single most common way a season goes wrong.
- Colour matching. Same dye lot, two rolls, two colours. On silk, 0.8 Delta E is visible to the eye.
- Grading. Stretch fabric put through a standard grade rule collapses at the upper sizes. Fix it on paper, not in production.
That list is the real garment production cost. None of it appears on a quote, all of it lands on you.
If you want a fair comparison, send the same written spec to three factories and ask each one for the same six lines. Any custom clothing manufacturer should manage that, and two of the three will. The third sends a single number with a friendly note, and that reply is itself the information you needed, they either can't split it or don't want you looking. We would rather lose the job than quote one round figure, because a round figure always gets re-quoted the moment something changes.
Why two quotes come back three times apart
We lose jobs on price and then get the call six weeks later. The gap is almost never one thing. It's usually five.
Fabric first, same name, different grade. Then QC: a factory doing one inspection on a handful of pieces is not doing what a factory doing three per piece is doing, and shouldn't cost the same. Then sampling, one round in whatever cloth is on the shelf, versus two to three mock-ups plus a final sample in the actual fabric. Then MOQ, because a factory built around 300 to 500 units per style prices for that volume, so its number for 30 pieces is either a favour or a trap. And finally what's excluded: the lines that aren't on the page because nobody asked.
One more, and it's the nastiest. The fabric supplier ships you a confirmation sample, you approve it, and the bulk goods that arrive are not the same cloth. That has happened to us. The only defence is keeping a sealed approved sample and taking a spectrophotometer reading when the goods come in, which is why we do both.
So when a Guangzhou garment manufacturer comes in at a third of everyone else, the useful question isn't why so cheap. It's which of those five they took out.
How we quote, and what we won't quote
Tech pack in, itemised quote back within 24 hours, every line separate. No tech pack? Send reference photos and your measurements and we'll build one, digital pattern and full size grading included. At the end of the job you get a written report on what went right and what didn't, which is the part most clothing manufacturer relationships skip.
Two things we won't do. We won't quote a silk dress until momme, grade and weave are settled, we've been burned by that sentence more than once. And we don't take hand-beading, at any quantity.
A cheap quote isn't a lie. It's a different garment. Ask which one you're buying.
Go deeper: MOQ Explained: where the fixed costs in your quote actually come from
Questions we get about this
What does it cost to manufacture clothes in Guangzhou?
Every style is different, so one number would be fiction. What we can give you is the shape of it: fabric is normally the largest line, then cut-make-trim, then trims, sampling and freight, quoted separately within 24 hours of a tech pack. Fabric behaves very differently from labour in the maths, 200 metres produced 180 pieces on a recent run, so around 10% waste needs to be in the number. Send the fabric spec and we'll put real figures against it.
Why are two factory quotes three times apart?
Fabric grade first. Two quotes both saying silk satin can be two entirely different cloths until momme, grade and weave are pinned down. Next is QC: three inspections per piece at AQL 1.0 to 2.0, with measurement at every size, is a different service from one inspection on a handful of garments. Then sampling, two to three mock-ups plus a final sample in the correct fabric, or one round in whatever is on the shelf.
Do I need a tech pack to get a quote?
No. Send reference photos and your measurements and we'll build the tech pack, with digital pattern and full size grading. You still get an itemised quote within 24 hours, with a note that the fabric spec is assumed until we confirm it. The one thing we can't quote without numbers is silk, where momme, grade and weave have to be known first.