Can you change a sleeve after the sample is approved? Yes. A private label clothing manufacturer will take the change, and the price depends on one date: the day your fabric goes under the knife.
Before cutting, a change costs a pattern edit and a day or two. After cutting, the same change costs panels, cloth, a new mock-up and a new slot on the line, about $6 a garment and three weeks on a 30-piece run.
We have quoted both versions of that bill more times than we would like. Here is how it breaks down, and the neckline we should have refused.
The three dates that decide what a change costs
Date one is the tech pack freeze, which happens when we quote. Change the spec before the quote and it is free.
Date two is the pattern freeze, at mock-up approval. After it, a shape change means a new pattern and a new mock-up.
Date three is the cloth freeze, at fabric inspection sign-off. This is the last free date, and almost nobody uses it.
Write all three into the production agreement. A factory that cannot name its own cut-off dates has no schedule to protect.
What a neckline change costs after the fabric is cut
Our 2022 case: 30 viscose dresses, front neckline dropped 2 centimetres after the lay was cut.
Twenty-two fronts had to be re-cut. The mill would not sell less than 50 metres, so $260 of cloth arrived for a change you could see on 30 garments.
A fresh mock-up was $220 and a pattern edit $90. The line lost its slot and we finished three weeks late.
The brand missed a March drop. We absorbed $430 of the $570 bill and kept the order, which is not a business model, it is a apology.
Changes that cost $6 a piece, and changes that never will
A hem depth change inside the existing allowance is labour: re-sew, re-press, re-inspect. At 30 pieces that is about $6 a garment and four to six days.
Thread colour, topstitch distance and label placement sit in the same bracket. They hurt the schedule, not the cloth.
A trim change is worse. A new custom button or a dyed zip carries a plate or dye minimum of $120 to $350, plus seven to ten days.
A fabric change is not a change. It restarts the order, and the cloth you already bought stays yours.
How to write a change order that actually holds
One page: what changes, what it costs, what date it moves, and who signs. No WhatsApp voice notes, no "just make it a bit lower".
We price the change before we cut it, in writing, and you approve or drop it. That single step removed most of our change-order arguments.
Keep one revision window per stage. A brand that sends three small changes in a week pays three times, because the line resets each time.
Our sourcing agent, still in training, is being taught to flag a change request against these three dates before it reaches a human. It gets the cloth freeze wrong about one time in five, so a person still checks.
What a change does to your delivery date, week by week
Week one is pattern and mock-up. A change here costs one to three days and nothing else.
Week two is cloth ordered but not delivered. The change costs a mill minimum and seven to ten days, because the mill books a new lot.
Week three is cloth on the floor, already cut. Three weeks and $6 a garment, and your freight date moves with it.
Week four is bulk sewn. The change becomes rework. Some of it is possible, none of it is cheap, and we will tell you which panels can survive.
The changes we are asked for most, priced
Neckline depth: $6 a piece inside the allowance, $19 and three weeks once the front is cut.
Hem length: $6 a piece before trimming, or $4 after, if there is cloth to let down and the hem was not cut to the final mark.
Sleeve length: cheap at the pattern stage, expensive at the panel stage, because a sleeve is its own cut piece and its own mock-up.
Label and care text: about $40 for a new plate and seven days. No cloth involved, which is why we ask for final copy at the deposit.
The one change that is always worth making
If the mock-up shows a fit problem, fix it. A fit change before the cut is a day and a pattern edit.
After the cut it is a season, and no brand has ever thanked us for shipping a garment that fit badly to protect a schedule.
Everything else on this page is arithmetic. That one is judgement, and we would rather lose a week than ship it.
What we ask you to decide before the deposit
Fit, neckline, hem depth, trim and label position. Five decisions, all cheap before the cut and expensive after.
If one of them is genuinely undecided, say so. We will hold the cut for a week rather than cut twice.
Holding costs you seven days. Recutting costs you three weeks and $6 a garment, and the second number always surprises people.
Our private label program puts the three cut-off dates on page one of the agreement, the FAQ covers who pays for a re-cut, and the case studies show a run we held for nine days to avoid exactly this.
Go deeper: why the sealed sample settles arguments · the 9 clauses before a deposit · what each mock-up round should fix
Questions we get about this
Can I change the fabric after I approve the sample?
You can, but it is a new order. New cloth, new mock-up, new wash test, roughly five weeks. The approved sample stays valid for the old fabric only.
Who pays when the factory made the mistake?
We do, in full, including the cloth. The distinction is written: a change you request is billed, a spec we missed is ours.
Quick Take
Three free dates. Tech pack freeze, pattern freeze, cloth freeze. Use the third.
$6 a piece inside the allowance. Hem depth and thread are labour, not cloth.
After cutting it is three weeks. Re-cut panels, 50 metre minimum, new mock-up.