A cut and sew manufacturer cuts and sews what you send, which means the outcome of the order is decided before the first roll arrives. Nine checks cover almost every problem we have seen at that handoff.
The short answer: confirm the metres, confirm the width, wash-test for shrinkage, check the shade band, label every roll, pack for the sea, send trims with spare, agree the arrival date, and put all of it on one packing list. Miss the first two and nothing downstream can rescue the order.
Here is each check with the number attached.
What a cut and sew workshop needs before your fabric ships
Four pieces of paper. A consumption sheet with metres per garment by size, a roll list with metres and width and dye lot per roll, a wash-test result, and a packing list that matches the cartons.
Without a consumption sheet we estimate, and an estimate on a 50-piece run can be three to five metres out. That is one garment short in one size, which is the worst kind of shortage to explain to a stockist.
Shrinkage and colour: test the roll before it is cut
A wash test takes 24 hours and costs nothing at a mill that already runs them. Ask for shrinkage on the warp and the weft, and treat anything above 3% as a problem for a fitted garment.
Colour is the second half of the same test. Every roll carries a dye lot number, and two lots in one order means two shade bands. On a 50-piece run that shows up as a side seam reading darker than the bodice.
If you have to use two lots, tell us before cutting rather than after. We split them by size or by panel so the difference lands somewhere a customer will not see it.
How many metres to send for a 50-piece cut and sew order
Take the consumption, add the marker waste, then add a handling margin. A viscose midi dress uses about 2.1 metres, so 50 pieces is 105 metres before any waste.
Marker waste on a five-size nest runs 8 to 12%, which is 8 to 13 metres on that order. Send 120 metres and you have a spare garment or two in hand; send 105 and you are short on one size.
Width matters as much as length. A 145cm roll and a 150cm roll are two different markers, and a width change after the lay is planned costs a full day of cutting room time.
On a print or a one-way design, add a further 5% for matching at the seam. A repeat that has to line up across a centre-front seam can push consumption to 2.35 metres, which is 12 metres more on the same 50 pieces.
Cartons, rolls and shade bands: how to pack fabric for shipping
One roll per bag, the lot number written on the outside in marker, and rolls grouped by lot inside the carton. Never mix two lots in one bag, however close the shades look under factory light.
Fabric travelling by sea needs a moisture barrier. A roll that sits in a container for thirty days without one arrives with mildew along the fold, and mildew does not wash out of a finished garment.
Send the trims with the fabric rather than after it. Buttons, zips, interlining and thread in the same shipment, with 5% spare on anything that can break or go missing.
Nine checks before your fabric leaves your supplier
One: consumption in metres per garment by size. Two: roll count, metres and width per roll. Three: the dye lot number on every roll. Four: a wash test for shrinkage and colour fastness.
Five: weight per roll, so the freight quote is right before the pallet is built. Six: a moisture barrier on sea freight. Seven: trims shipped together with 5% spare. Eight: an arrival date agreed at least seven days before cutting.
Nine: one packing list that matches the cartons. Nine lines on a single page, and we ask for all nine on the first order rather than on the second.
What goes wrong when fabric arrives late
A late roll does not only delay the start, it loses the line slot. Our cutting room is booked two to three weeks out, and a slot given up goes straight to another order.
In 2019 a client sent six unlabelled rolls with no lot numbers on them. We cut the largest rolls first and found two of them half a shade darker halfway through the lay. Seven of forty-five skirts had to be remade from a re-ordered twelve metres, which cost nine days and started a new shade band.
We keep the roll list pinned to the cutting ticket, so when a defect turns up in a roll we know which garments carry it and how many metres are left in that lot. That traceability is what makes a remake a two-day job instead of a fresh order.
Cut and sew is a partnership with a clean split: you own the cloth, we own the making. The handoff is where the risk sits, and it is the cheapest part of the order to get right.
Our cut and sew page sets out what we do in-house and what you supply, and the FAQ page answers the fabric questions we get most. The case studies page lists delivered orders with their quantities and fabric sources attached. Our production process page maps the two mock-up rounds and the three inspections. The Fashion Pains Solver we are bringing online is being built to flag a fabric handoff that will not cut cleanly, before the rolls ever leave your supplier.
Go deeper: what a cut and sew manufacturer includes, and what you supply · cut and sew minimums: why most factories say 300 pieces · fabric minimums: how a small brand buys 100 metres
Questions we get about this
Who buys the fabric for a cut and sew order?
You do. In cut and sew you supply the cloth and the trims, and we supply cutting, sewing, finishing and inspection. That is the difference from full package, where we source the fabric and carry the shade risk. Most first orders start on cut and sew because you keep control of the cloth.
What happens if my fabric shrinks more than expected?
The finished garment measures undersized, and no amount of pressing fixes it. That is why we wash-test every client-supplied roll before cutting. Above 3% shrinkage on a fitted style we stop and ask you to re-order, rather than cut cloth that will fail the final measurement check.
Quick Take
Nine checks, one page. Consumption, roll list, dye lots, wash test, weight, moisture barrier, trims with spare, arrival date, packing list.
Send 120 metres, not 105. A 50-piece viscose dress uses 105 metres before the 8 to 12% marker waste on a five-size nest.
Two dye lots is two shades. Tell us before cutting and we split by size or panel, so the break lands out of sight.
About UP Fashion
UP Fashion is a Guangzhou garment manufacturer founded in 2016, run by a team with 20+ years of OEM experience in silk, wool and embroidery. We cut and sew from 30 pieces per style, wash-test client fabric before it is laid, and inspect three times before shipping. Cut and sew and full package are both quoted line by line.