A small batch clothing manufacturer ships 300 pieces in a part container, and a part container is where cartons get crushed and wet. What protects a small order at sea? Board grade, stack height and about 500 grams of desiccant per cubic metre.
Why do garments arrive damp when nothing leaked? Condensation, not rain. A box loaded at 32 degrees in Guangzhou and opened at 12 degrees in Rotterdam passes through a 20 degree swing, and the water comes out of the air inside it.
Carton board grades: what K=A and K=K actually mean
The letters are the liners and the flute. K is kraft, A is a flute profile, and K=K means kraft on both faces. A K=K carton holds roughly 25 per cent more stacking load than K=A of the same footprint.
On 300 pieces we use K=K for anything going by sea, and K=A only for air freight, where the box is handled twice and then discarded.
The difference is about $0.35 a carton. Across 25 cartons that is $9, which is the cheapest insurance in the shipment.
Stack height and compression: why the bottom carton fails
A 40 foot high cube takes a stack five cartons high. If a carton of 12 garments weighs 11 kg, the bottom one carries 44 kg for 30 days in humid air.
Board loses around half its compression strength at 85 per cent relative humidity. That is why the bottom layer collapses while the top three look perfect in the photo your forwarder sends.
We cap sea freight stacks at four high and put a plywood sheet between layers when carton sizes are mixed.
Container rain: where the water comes from in a dry box
Warm air holds water. Load at 80 per cent humidity, seal the doors, and sail into a cold latitude. The moisture condenses on the steel ceiling and drips onto whatever is highest.
A 40 foot box can release several litres over a 30 day transit. It lands on the top layer and usually along one side, which is exactly what the damage report shows.
CBM maths for a 300-piece order
A 60 by 40 by 30 cm carton is 0.072 cubic metres. At 12 garments a carton, 300 pieces is 25 cartons, so 1.8 cubic metres.
LCL is charged with a 1 cubic metre minimum, so 1.8 CBM pays for 1.8. Combining two styles into one shipment saves a handling fee, not a container.
Palletising costs height. A 1.8 m pallet of 25 cartons may not load the way floor-loaded cartons do, and the freight quote moves 10 to 15 per cent. Ask your forwarder for both numbers before you choose.
Desiccant, liners and the 65 per cent humidity line
We use 500 g of calcium chloride desiccant per cubic metre, hung at the door end where air moves least. For 1.8 CBM that is one kilogram, in two bags.
A container liner is the upgrade. It runs about $90 for a part container and it keeps condensation off the cargo entirely.
Above 65 per cent relative humidity, viscose and linen support mould within roughly 10 days. Below 60, they do not.
Moisture already inside the garment
Viscose holds 12 to 13 per cent of its own weight in water at 65 per cent humidity. Cotton holds 8.5, polyester 0.4. That water is in the fabric when it is folded, and a sealed polybag keeps it there.
Press a garment warm and bag it the same hour and you have trapped heat as well as vapour. Cool it in a container and the vapour becomes droplets on the inside of the bag.
We let pressed garments rest 24 hours in the packing area before bagging in humid months. It costs a day and it is the cheapest fix on this page.
LCL versus FCL for 300 pieces
At 1.8 CBM a 300-piece order is nowhere near a container. A 20 foot box holds about 28 CBM, so FCL means paying for space you do not fill.
LCL adds 3 to 5 days at a consolidation warehouse and one more handling cycle, which is where cartons get restacked by someone who does not know what is inside.
For 300 pieces we still recommend LCL. Above roughly 12 CBM the maths flips and a 20 foot container beats the LCL rate.
What to write on the packing list
Five lines: carton grade, gross weight, CBM, desiccant weight in grams, and a stack limit. A forwarder who reads "max 4 high" will not build a stack of six to save floor space.
We photograph every stack before the doors close, with the seal number visible. It is not paperwork for its own sake. It is the only evidence that exists once the container leaves the yard.
The 2019 shipment that arrived with mould on 11 dresses
In 2019 we shipped 200 viscose dresses to a UK brand in 18 cartons, LCL, in July. Eleven pieces arrived with mould along the fold line.
The cause was ours. We used 200 g of desiccant for 1.3 CBM, stacked cartons against the container wall, and shipped in the wettest month of the year.
Cleaning cost RMB 60 a piece and we wrote off the eleven. Since then the desiccant weight sits on the packing list, so a client can check it without asking us.
Our small batch production line ships LCL most weeks, the case studies show a 300-piece order from cutting to container, and the FAQ answers who pays when cartons arrive damaged.
Go deeper: packing for retail at 30 pieces · why fabric moves in humid air · shipping a small order without a forwarder
Questions we get about this
Do I need a container liner for 25 cartons?
Not always. In July and August, or on any route crossing into a cold climate, we recommend it. It is about $90 and it removes the failure mode entirely.
Who pays if the cartons arrive crushed?
It depends on the Incoterm and on the survey. Under FOB the risk passes at loading, so photographs at the container door matter more than an argument afterwards. We photograph every stack before the doors close.
Quick Take
Condensation, not rain. A sealed box crossing climates releases litres onto the top layer.
K=K for sea. $9 more across 25 cartons, about 25 per cent more stacking strength.
500 g desiccant per CBM. Our 2019 shipment used 200 g and lost 11 dresses to mould.
About UP Fashion